How Long Does a Water Job Take?
7/28/2020 (Permalink)
Many times, whilst getting started with a job, the first question a customer will ask is, “how long will this take?” We here at SERVPRO know that your time is valuable, we want to get the job done as fast as possible and make you say it looks “Like it never even happened.”
The typical timeline for a water job is 3-5 days. The first day of contact with us is all about stabilization. At this point there will not have been enough time to be in touch with insurance agents and adjusters to figure out what we are allowed to proceed with. To stabilize the situation, we set equipment and extract standing water if possible.
On the second day, contact with the adjuster has been made and we are now clear as to what we are allowed to tear out and fix. We begin that work and continue drying the affected area. Days 3-5 are dedicated to drying and monitoring your job.
After the job has been completed, the last step is for us to pick up our equipment and send the bill. That is how simple a job handled by SERVPRO of Effingham, Mattoon, Charleston can be!
Call today if you experience a water damage: 217-536-6655